South Carolina Code of Laws
Unannotated
Title 58 - PUBLIC UTILITIES, SERVICES AND CARRIERS
CHAPTER 41
Renewable Energy Programs
SECTION 58-41-05.Directions to commission.
The commission is directed to address all renewable energy issues in a fair and balanced manner, considering the costs and benefits to all customers of all programs and tariffs that relate to renewable energy and energy storage, both as part of the utility's power system and as direct investments by customers for their own energy needs and renewable goals. The commission also is directed to ensure that the revenue recovery, cost allocation, and rate design of utilities that it regulates are just and reasonable and properly reflect changes in the industry as a whole, the benefits of customer renewable energy, energy efficiency, and demand response, as well as any utility or state-specific impacts unique to South Carolina which are brought about by the consequences of this act.
HISTORY: 2019 Act No. 62 (H.3659), SECTION 1, eff May 16, 2019.
SECTION 58-41-10.Definitions.
As used in this chapter:
(1) "AC" means alternating current as measured at the point of interconnection of the small power producer's facility to the interconnecting electrical utility's transmission or distribution system.
(2) "Avoided costs" means the incremental costs to an electric utility of electric energy or capacity or both which, but for the purchase from the qualifying facility or qualifying facilities, such utility would generate itself or purchase from another source.
(3) "Commission" means the South Carolina Public Service Commission.
(4) "Electrical utility" is defined as set forth in Section 58-27-10(7), provided, however, that electrical utilities serving less than one hundred thousand customer accounts must be exempt from the provisions of this chapter. A renewable energy supplier participating in an electrical utility's voluntary renewable energy program pursuant to this chapter must not be considered an electrical utility for purposes of this chapter.
(5) "Eligible customer" means a retail customer with a new or existing contract demand greater than or equal to one megawatt at a single-metered location or aggregated across multiple-metered locations.
(6) "Generation credit" means a credit applied by an electrical utility to the bill of a participating customer that is equal to the value of the energy and capacity avoided by the electrical utility as a result of procuring energy and capacity from a renewable energy facility.
(7) "Participating customer" means an eligible customer that elects to have a portion or all of its electricity needs supplied by a voluntary renewable energy program.
(8) "Participating customer agreement" means an agreement between a participating customer, its electrical utility, and the renewable energy supplier establishing each party's rights and obligations under the electrical utility's voluntary renewable energy program.
(9) "Power purchase agreement" means an agreement between an electrical utility and a small power producer for the purchase and sale of energy, capacity, and ancillary services from the small power producer's qualifying small power production facility.
(10) "PURPA" means the Public Utility Regulatory Policies Act of 1978, as amended.
(11) "Renewable energy contract" means a power purchase agreement between an electrical utility and a renewable energy supplier that commits the parties to participating in an electrical utility's voluntary renewable energy program for the purchase and sale of energy and capacity.
(12) "Renewable energy facility" means a facility for the production of electrical energy that utilizes a renewable generation resource as defined in Section 58-39-120(F), that is placed in service after the effective date of this chapter, and for which costs are not included in an electrical utility's rates.
(13) "Renewable energy supplier" means the owner or operator of a renewable energy facility, including the affiliate of an electrical utility that contracts with a participating customer.
(14) "Small power producer" means a person or corporation owning or operating a "qualifying small power production facility" as defined in 16 U.S.C. Section 796, as amended.
(15) "Standard offer" means the avoided cost rates, power purchase agreement, and terms and conditions approved by the commission and applicable to purchases of energy and capacity by electrical utilities as provided in this chapter from small power producers up to two megawatts AC in size.
(16) "Voluntary renewable energy program" means a tariff filed with the commission by an electrical utility that enables a participating commercial or industrial customer to receive and pay for electric service, that reflects the program cost, and that includes the environmental attributes specified in the participating customer agreement and renewable energy contract, including a generation credit for such renewable energy, from the electrical utility pursuant to the terms of the tariff.
(17) "Energy storage facilities" means any commercially available technology that is capable of absorbing energy and storing it for a period of time for use at a later time including, but not limited to, electrochemical, thermal, and electromechanical technologies.
HISTORY: 2019 Act No. 62 (H.3659), SECTION 1, eff May 16, 2019; 2025 Act No. 41 (H.3309), SECTION 16, eff May 12, 2025.
Editor's Note
2025 Act No. 41, SECTION 1, provides as follows:
"SECTION 1. This act may be cited as the 'South Carolina Energy Security Act.' "
2025 Act No. 41, SECTION 33, provides as follows:
"SECTION 33. (A) To foster economic development and future jobs in this State resulting from the supply chains associated with the same while supporting the significant and growing energy and capacity needs of the State, enhance grid resiliency, and maintain reliability, the General Assembly finds that the State of South Carolina should take steps necessary to encourage the development of a diverse mix of long-lead, clean generation resources that may include nuclear and advanced nuclear, biomass as defined in Section 12-63-20(B)(2) of the S.C. Code, hydrogen-capable resources, fusion energy, and other technologies, and should preserve the option of efficiency development of such long-lead resources with timely actions to establish or maintain eligibility for or capture available tax or other financial incentives or address operational needs.
"(B) For an electrical utility to capture available tax or other financial or operational incentives for South Carolina ratepayers in a timely manner, the commission may find that actions by an electrical utility in pursuit of the directives in Section 58-37-35(A) are in the public interest, provided that the commission determines that such proposed actions are in the public interest and reasonably balance economic development and industry retention benefits, capacity expansion benefits, resource adequacy and diversification and potential risks, costs, and benefits to ratepayers and otherwise comply with all other legal requirements applicable to the electrical utility's proposed action. For the South Carolina Public Service Authority, the Office of Regulatory Staff and the Public Service Authority's board of directors shall apply the same principles described in this subsection in evaluating and approving actions proposed by the management of the Public Service Authority to achieve the objectives of this section."
2025 Act No. 41, SECTION 41, provides as follows:
"SECTION 41. (A) Five years after the effective date of this act, the Office of the Regulatory Staff shall prepare a report, to be filed with the Public Utilities Review Committee and the General Assembly, to address the implementation of Article 24, Chapter 27, Title 58 as it relates to the following areas:
"(1) assessing the functioning of the procedures established by section with recommendation for any changes required to ensure their efficient functioning, to promote regulatory efficiency, and to make further the establishment of just, reasonable, and fair rates;
"(2) assessing the effect of rates on ratepayers of all classes;
"(3) assessing the reliability of the electric system and whether investments made by electric utilities increased reliability compared to any change in electric utility rates experienced by ratepayers within the same timeframe; and
"(4) any other information requested by the General Assembly to be included within the report.
"(B) The Office of Regulatory Staff may engage a qualified, independent third party to assist in preparation of the report.
"(C) All expenses and charges incurred by the Office of Regulatory Staff in the performance of its duties within this section may be defrayed by assessments made by the Comptroller General against the regulated electrical utilities regulated and based upon twenty-five percent of the gross revenues collected by such electrical utilities from their business done wholly within this State in the manner set out in Section 58-4-60 for other corporations."
2025 Act No. 41, SECTION 42, provides as follows:
"SECTION 42. Upon passage of this act, Dominion Energy shall evaluate the process for converting the Wateree Generating Station from coal-fired generation to biomass-fired generation. Biomass-fired generation includes, but is not limited to, generation from the firing of wood pellets and wood chips. Dominion Energy must make a report concerning the conversion process to the Public Service Commission and General Assembly by no later than January 13, 2026."
Effect of Amendment
2025 Act No. 41, SECTION 16, added (17), defining "Energy storage facilities".
SECTION 58-41-20.Review and approval proceedings for electrical utilities' avoided cost methodologies, standard offers, form contracts, and commitment to sell forms.
(A) As soon as is practicable after the effective date of this chapter, the commission shall open a docket for the purpose of establishing each electrical utility's standard offer, avoided cost methodologies, form contract power purchase agreements, commitment to sell forms, and any other terms or conditions necessary to implement this section. Within six months after the effective date of this chapter, and at least once every twenty-four months thereafter, the commission shall approve each electrical utility's standard offer, avoided cost methodologies, form contract power purchase agreements, commitment to sell forms, and any other terms or conditions necessary to implement this section. Within such proceeding the commission shall approve one or more standard form power purchase agreements for use for qualifying small power production facilities not eligible for the standard offer. Such power purchase agreements shall contain provisions, including, but not limited to, provisions for force majeure, indemnification, choice of venue, and confidentiality provisions and other such terms, but shall not be determinative of price or length of the power purchase agreement. The commission may approve multiple form power purchase agreements to accommodate various generation technologies and other project-specific characteristics. This provision shall not restrict the right of parties to enter into power purchase agreements with terms that differ from the commission-approved form(s). Any decisions by the commission shall be just and reasonable to the ratepayers of the electrical utility, in the public interest, consistent with PURPA and the Federal Energy Regulatory Commission's implementing regulations and orders, and nondiscriminatory to small power producers, and shall strive to reduce the risk placed on the using and consuming public.
(1) Proceedings conducted pursuant to this section shall be separate from the electrical utilities' annual fuel cost proceedings conducted pursuant to Section 58-27-865.
(2) Proceedings shall include an opportunity for intervention, discovery, filed comments or testimony, and an evidentiary hearing.
(B) In implementing this chapter, the commission shall treat small power producers on a fair and equal footing with electrical utility-owned resources by ensuring that:
(1) rates for the purchase of energy and capacity fully and accurately reflect the electrical utility's avoided costs;
(2) power purchase agreements, including terms and conditions, are commercially reasonable and consistent with regulations and orders promulgated by the Federal Energy Regulatory Commission implementing PURPA; and
(3) each electrical utility's avoided cost methodology fairly accounts for costs avoided by the electrical utility or incurred by the electrical utility, including, but not limited to, energy, capacity, and ancillary services provided by or consumed by small power producers including those utilizing energy storage equipment. Avoided cost methodologies approved by the commission may account for differences in costs avoided based on the geographic location and resource type of a small power producer's qualifying small power production facility.
(C) The avoided cost rates offered by an electrical utility to a small power producer not eligible for the standard offer must be calculated based on the avoided cost methodology most recently approved by the commission. In the event that a small power producer and an electrical utility are unable to mutually agree on an avoided cost rate, the small power producer shall have the right to have any disputed issues resolved by the commission in a formal complaint proceeding. The commission may require mediation prior to a formal complaint proceeding.
(D) A small power producer shall have the right to sell the output of its facility to the electrical utility at the avoided cost rates and pursuant to the power purchase agreement then in effect by delivering an executed notice of commitment to sell form to the electrical utility. The commission shall approve a standard notice of commitment to sell form to be used for this purpose that provides the small power producer a reasonable period of time from its submittal of the form to execute a power purchase agreement. In no event, however, shall the small power producer, as a condition of preserving the pricing and terms and conditions established by its submittal of an executed commitment to sell form to the electrical utility, be required to execute a power purchase agreement prior to receipt of a final interconnection agreement from the electrical utility.
(E)(1) Electrical utilities shall file with the commission power purchase agreements entered into pursuant to PURPA, resulting from voluntary negotiation of contracts between an electrical utility and a small power producer not eligible for the standard offer.
(2) The commission is authorized to open a generic docket for the purposes of creating programs for the competitive procurement of energy and capacity from renewable energy facilities by an electrical utility within the utility's balancing authority area if the commission determines such action to be in the public interest.
(3) In establishing standard offer and form contract power purchase agreements, the commission shall consider whether such power purchase agreements should prohibit any of the following:
(a) termination of the power purchase agreement, collection of damages from small power producers, or commencement of the term of a power purchase agreement prior to commercial operation, if delays in achieving commercial operation of the small power producer's facility are due to the electrical utility's interconnection delays; or
(b) the electrical utility reducing the price paid to the small power producer based on costs incurred by the electrical utility to respond to the intermittent nature of electrical generation by the small power producer.
(F)(1) Electrical utilities, subject to approval of the commission, shall offer to enter into fixed price power purchase agreements with small power producers for the purchase of energy and capacity at avoided cost, with commercially reasonable terms and a duration of ten years. The commission may also approve commercially reasonable fixed price power purchase agreements with a duration longer than ten years, which must contain additional terms, conditions, and/or rate structures as proposed by intervening parties and approved by the commission, including, but not limited to, a reduction in the contract price relative to the ten-year avoided cost. Notwithstanding any other language to the contrary, the commission will make such a determination in proceedings conducted pursuant to subsection (A). The avoided cost rates applicable to fixed price power purchase agreements entered into pursuant to this item shall be based on the avoided cost rates and methodologies as determined by the commission pursuant to this section. The terms of this subsection apply only to those small power producers whose qualifying small power production facilities have active interconnection requests on file with the electrical utility prior to the effective date of this act. The commission may determine any other necessary terms and conditions deemed to be in the best interest of the ratepayers. This item is not intended, and shall not be construed, to abrogate small power producers' rights under PURPA that existed prior to the effective date of the act.
(2) Once an electrical utility has executed interconnection agreements and power purchase agreements with qualifying small power production facilities located in South Carolina with an aggregate nameplate capacity equal to twenty percent of the previous five-year average of the electrical utility's South Carolina retail peak load, that electrical utility shall offer to enter into fixed price power purchase agreements with small power producers for the purchase of energy and capacity at avoided cost, with the terms, conditions, rates, and terms of length for contracts as determined by the commission in a separate docket or in a proceeding conducted pursuant to subsection (A). The commission is expressly directed to consider the potential benefits of terms with a longer duration to promote the state's policy of encouraging renewable energy.
(G) Nothing in this section prohibits the commission from adopting various avoided cost methodologies or amending those methodologies in the public interest.
(H) Unless otherwise agreed to between the electrical utility and the small power producer, a power purchase agreement entered into pursuant to PURPA may not allow curtailment of qualifying facilities in any manner that is inconsistent with PURPA or implementing regulations and orders promulgated by the Federal Energy Regulatory Commission.
(I) The commission is authorized to employ, through contract or otherwise, third-party consultants and experts in carrying out its duties under this section including, but not limited to, evaluating avoided cost rates, methodologies, terms, calculations, and conditions under this section. The commission is exempt from complying with the State Procurement Code in the selection and hiring of a third-party consultant or expert authorized by this subsection. The commission shall engage, for each utility, a qualified independent third party to submit a report that includes the third party's independently derived conclusions as to that third party's opinion of each utility's calculation of avoided costs for purposes of proceedings conducted pursuant to this section. The qualified independent third party is subject to the same ex parte prohibitions contained in Chapter 3, Title 58 as all other parties. The qualified independent third party shall submit all requests for documents and information necessary to their analysis under the authority of the commission and the commission shall have full authority to compel response to the requests. The qualified independent third party's duty will be to the commission. Any conclusions based on the evidence in the record and included in the report are intended to be used by the commission along with all other evidence submitted during the proceeding to inform its ultimate decision setting the avoided costs for each electrical utility. The utilities may require confidentiality agreements with the independent third party that do not impede the third-party analysis. The utilities shall be responsive in providing all documents, information, and items necessary for the completion of the report. The independent third party shall also include in the report a statement assessing the level of cooperation received from the utility during the development of the report and whether there were any material information requests that were not adequately fulfilled by the electrical utility. Any party to this proceeding shall be able to review the report including the confidential portions of the report upon entering into an appropriate confidentiality agreement. The commission and the Office of Regulatory Staff may not hire the same third-party consultant or expert in the same proceeding or to address the same or similar issues in different proceedings.
(J) Each electrical utility's avoided cost filing must be reasonably transparent so that underlying assumptions, data, and results can be independently reviewed and verified by the parties and the commission. The commission may approve any confidentiality protections necessary to allow for independent review and verification of the avoided cost filing.
HISTORY: 2019 Act No. 62 (H.3659), SECTION 1, eff May 16, 2019; 2025 Act No. 41 (H.3309), SECTION 17, eff May 12, 2025.
Editor's Note
2025 Act No. 41, SECTION 1, provides as follows:
"SECTION 1. This act may be cited as the 'South Carolina Energy Security Act.' "
2025 Act No. 41, SECTION 33, provides as follows:
"SECTION 33. (A) To foster economic development and future jobs in this State resulting from the supply chains associated with the same while supporting the significant and growing energy and capacity needs of the State, enhance grid resiliency, and maintain reliability, the General Assembly finds that the State of South Carolina should take steps necessary to encourage the development of a diverse mix of long-lead, clean generation resources that may include nuclear and advanced nuclear, biomass as defined in Section 12-63-20(B)(2) of the S.C. Code, hydrogen-capable resources, fusion energy, and other technologies, and should preserve the option of efficiency development of such long-lead resources with timely actions to establish or maintain eligibility for or capture available tax or other financial incentives or address operational needs.
"(B) For an electrical utility to capture available tax or other financial or operational incentives for South Carolina ratepayers in a timely manner, the commission may find that actions by an electrical utility in pursuit of the directives in Section 58-37-35(A) are in the public interest, provided that the commission determines that such proposed actions are in the public interest and reasonably balance economic development and industry retention benefits, capacity expansion benefits, resource adequacy and diversification and potential risks, costs, and benefits to ratepayers and otherwise comply with all other legal requirements applicable to the electrical utility's proposed action. For the South Carolina Public Service Authority, the Office of Regulatory Staff and the Public Service Authority's board of directors shall apply the same principles described in this subsection in evaluating and approving actions proposed by the management of the Public Service Authority to achieve the objectives of this section."
2025 Act No. 41, SECTION 41, provides as follows:
"SECTION 41. (A) Five years after the effective date of this act, the Office of the Regulatory Staff shall prepare a report, to be filed with the Public Utilities Review Committee and the General Assembly, to address the implementation of Article 24, Chapter 27, Title 58 as it relates to the following areas:
"(1) assessing the functioning of the procedures established by section with recommendation for any changes required to ensure their efficient functioning, to promote regulatory efficiency, and to make further the establishment of just, reasonable, and fair rates;
"(2) assessing the effect of rates on ratepayers of all classes;
"(3) assessing the reliability of the electric system and whether investments made by electric utilities increased reliability compared to any change in electric utility rates experienced by ratepayers within the same timeframe; and
"(4) any other information requested by the General Assembly to be included within the report.
"(B) The Office of Regulatory Staff may engage a qualified, independent third party to assist in preparation of the report.
"(C) All expenses and charges incurred by the Office of Regulatory Staff in the performance of its duties within this section may be defrayed by assessments made by the Comptroller General against the regulated electrical utilities regulated and based upon twenty-five percent of the gross revenues collected by such electrical utilities from their business done wholly within this State in the manner set out in Section 58-4-60 for other corporations."
2025 Act No. 41, SECTION 42, provides as follows:
"SECTION 42. Upon passage of this act, Dominion Energy shall evaluate the process for converting the Wateree Generating Station from coal-fired generation to biomass-fired generation. Biomass-fired generation includes, but is not limited to, generation from the firing of wood pellets and wood chips. Dominion Energy must make a report concerning the conversion process to the Public Service Commission and General Assembly by no later than January 13, 2026."
2019 Act No. 62, SECTION 14, provides as follows:
"SECTION 14. The provisions of Section 58-41-20 shall not be interpreted to supersede the conditions of any settlement entered into by an electrical utility and filed with the commission prior to the adoption of this act."
Effect of Amendment
2025 Act No. 41, SECTION 17, made nonsubstantive changes.
SECTION 58-41-30.Voluntary renewable energy programs.
(A) The ability to utilize clean energy resources for electric power generation is important to attract prospective commercial or industrial entities to invest in South Carolina and to encourage and incent robust economic growth in the State.
(B) The commission shall be responsive to the clean energy needs of customers and the economic development and industry retention implications for the State when reviewing and approving voluntary clean energy programs. The commission shall consider updates to these voluntary renewable energy programs on an ongoing basis.
(C) Within one hundred-twenty days of the effective date of this chapter, each electrical utility shall file a proposed voluntary renewable energy program for review and approval by the commission, unless as of July 1, 2025, the electrical utility already has a voluntary renewable energy program that conforms with the requirements of this section on file with the commission. The commission shall conduct a proceeding to review the program and establish reasonable terms and conditions for the program. Interested parties shall have the right to participate in the proceeding. The commission must periodically hold additional proceedings to evaluate whether updates to the programs are necessary. At a minimum, each electrical utility must submit to the commission a program for which:
(1) the participating customer shall have the right to select the renewable energy facility and negotiate with the renewable energy supplier on the price to be paid by the participating customer for the energy, capacity, and clean energy environmental attributes of the renewable energy facility and the term of such agreement so long as such terms are consistent with the voluntary renewable program service agreement as approved by the commission;
(2) the renewable energy contract and the participating customer agreement must be of equal duration;
(3) in addition to paying a retail bill calculated pursuant to the rates and tariffs that otherwise would apply to the participating customer, reduced by the amount of the generation credit, a participating customer shall reimburse the electrical utility on a monthly basis for the amount paid by the electrical utility to the renewable energy supplier pursuant to the participating customer agreement and renewable energy contract, plus an administrative fee approved by the commission; and
(4) eligible customers must be allowed to bundle their demand under a single participating customer agreement and renewable energy contract and must be eligible annually to procure an amount of capacity as approved by the commission.
(D) The commission must approve voluntary renewable energy programs, in addition to those provided for in subsection (C), where the participating customer purchases clean energy environmental attributes of new or existing renewable energy facilities owned and operated and recovered on a cost-of-service basis by the electrical utility or otherwise supplies through the execution of agreements with third parties within the utility's balancing authority area. Voluntary renewable energy programs shall also facilitate behind-the-meter options for customers and access to renewable energy resource generation.
(E) The commission may approve a program that provides for options that include, but are not limited to, both variable and fixed generation credit options.
(F) The commission shall limit the total portion of each electrical utility's voluntary renewable energy program that is eligible for the program at a level consistent with the public interest and shall provide standard terms and conditions for the participating customer agreement and the renewable energy contract, subject to commission review and approval.
(G) A participating customer shall bear the burden of any reasonable costs associated with participating in a voluntary renewable energy program. Purchased power costs incurred by an electrical utility as a result of subsection (C) shall be recovered in the electrical utility's fuel clause pursuant to Section 58-27-865.
(H) A renewable energy facility may be located anywhere in the electrical utility's service territory within the utility's balancing authority.
HISTORY: 2019 Act No. 62 (H.3659), SECTION 1, eff May 16, 2019; 2025 Act No. 41 (H.3309), SECTION 15, eff May 12, 2025.
Editor's Note
2025 Act No. 41, SECTION 1, provides as follows:
"SECTION 1. This act may be cited as the 'South Carolina Energy Security Act.' "
2025 Act No. 41, SECTION 33, provides as follows:
"SECTION 33. (A) To foster economic development and future jobs in this State resulting from the supply chains associated with the same while supporting the significant and growing energy and capacity needs of the State, enhance grid resiliency, and maintain reliability, the General Assembly finds that the State of South Carolina should take steps necessary to encourage the development of a diverse mix of long-lead, clean generation resources that may include nuclear and advanced nuclear, biomass as defined in Section 12-63-20(B)(2) of the S.C. Code, hydrogen-capable resources, fusion energy, and other technologies, and should preserve the option of efficiency development of such long-lead resources with timely actions to establish or maintain eligibility for or capture available tax or other financial incentives or address operational needs.
"(B) For an electrical utility to capture available tax or other financial or operational incentives for South Carolina ratepayers in a timely manner, the commission may find that actions by an electrical utility in pursuit of the directives in Section 58-37-35(A) are in the public interest, provided that the commission determines that such proposed actions are in the public interest and reasonably balance economic development and industry retention benefits, capacity expansion benefits, resource adequacy and diversification and potential risks, costs, and benefits to ratepayers and otherwise comply with all other legal requirements applicable to the electrical utility's proposed action. For the South Carolina Public Service Authority, the Office of Regulatory Staff and the Public Service Authority's board of directors shall apply the same principles described in this subsection in evaluating and approving actions proposed by the management of the Public Service Authority to achieve the objectives of this section."
2025 Act No. 41, SECTION 41, provides as follows:
"SECTION 41. (A) Five years after the effective date of this act, the Office of the Regulatory Staff shall prepare a report, to be filed with the Public Utilities Review Committee and the General Assembly, to address the implementation of Article 24, Chapter 27, Title 58 as it relates to the following areas:
"(1) assessing the functioning of the procedures established by section with recommendation for any changes required to ensure their efficient functioning, to promote regulatory efficiency, and to make further the establishment of just, reasonable, and fair rates;
"(2) assessing the effect of rates on ratepayers of all classes;
"(3) assessing the reliability of the electric system and whether investments made by electric utilities increased reliability compared to any change in electric utility rates experienced by ratepayers within the same timeframe; and
"(4) any other information requested by the General Assembly to be included within the report.
"(B) The Office of Regulatory Staff may engage a qualified, independent third party to assist in preparation of the report.
"(C) All expenses and charges incurred by the Office of Regulatory Staff in the performance of its duties within this section may be defrayed by assessments made by the Comptroller General against the regulated electrical utilities regulated and based upon twenty-five percent of the gross revenues collected by such electrical utilities from their business done wholly within this State in the manner set out in Section 58-4-60 for other corporations."
2025 Act No. 41, SECTION 42, provides as follows:
"SECTION 42. Upon passage of this act, Dominion Energy shall evaluate the process for converting the Wateree Generating Station from coal-fired generation to biomass-fired generation. Biomass-fired generation includes, but is not limited to, generation from the firing of wood pellets and wood chips. Dominion Energy must make a report concerning the conversion process to the Public Service Commission and General Assembly by no later than January 13, 2026."
Effect of Amendment
2025 Act No. 41, SECTION 15, rewrote the section.
SECTION 58-41-40.Neighborhood community solar programs; review of programs; recovery of costs.
(A) It is the intent of the General Assembly to expand the opportunity to support solar energy and support access to solar energy options for all South Carolinians, including those who lack the income to afford the upfront investment in solar panels or those who do not own their homes or have suitable rooftops. The General Assembly encourages all electric service providers in this State to consider offering neighborhood community solar programs.
(B)(1) Within sixty days after the effective date of this chapter, the commission shall open a docket for each electrical utility to review the community solar programs established pursuant to Act 236 of 2014 and to solicit status information on existing programs from the electrical utilities.
(2) Within one hundred and eighty days after the commission opens the docket pursuant to item (1), the electrical utilities shall update their report on their existing programs and may propose new programs.
(C) Subject to review by the commission, a public utility must be entitled to full and timely cost recovery for all reasonable and prudent costs incurred in implementing and complying with this section. Participating customers shall bear the burden of any reasonable and prudent costs associated with participating in a neighborhood community solar program; however, the commission shall nonetheless promote access to solar energy projects for low and moderate income customers. An electrical utility may not charge any nonparticipating customers for any costs incurred pursuant to the provisions of this section.
HISTORY: 2019 Act No. 62 (H.3659), SECTION 1, eff May 16, 2019.
SECTION 58-41-50.Electrical utilities; cost-effective bulk power solutions.
(A) The General Assembly encourages electrical utilities to explore cost effective, efficient bulk power solutions, particularly during periods of constrained capacity, for nonresidential customers with electric loads in excess of 25 megawatts.
(B)(1) An electrical utility may file a proposed agreement regarding co-located resources between the utility and a customer or multiple customers with an electric load in excess of 25 megawatts for the commission's consideration. The proposed agreement must contain at least one of the following requirements:
(a) co-location of electric generation or storage on the customer's property provides bulk system benefits for all customers and benefits for the host customer;
(b) co-location of renewable electric generation resources on the customer's property provides bulk system benefits for all customers and the renewable attributes associated with such generation can be allocated to the host customer;
(c) co-location of electric generation on the customer's property would result in permitting and siting efficiencies to enable electric generation to come online earlier than otherwise could occur; or
(d) co-location of electric generation resources on the customer's property could be utilized as resiliency resources to serve the electric grid in times of need.
(2) In the filing with the commission, the electrical utility must include a description of:
(a) credit and ratepayer protections included in the agreement;
(b) the contractual terms that preserves the electrical utility's operation of resources; and
(c) how costs and benefits associated with the agreement would be allocated among the customer who is a party to the agreement and other customers in the electrical utility's balancing area.
(C) The commission must give a proposed agreement filed pursuant to this section expedited consideration. The commission may approve the proposed agreement if the commission finds:
(1) the proposed program was voluntarily agreed upon by the electrical utility and the customer or multiple customers;
(2) the filing meets the requirements of this section; and
(3) the proposed agreement is in the public interest.
(D) For purposes of this section, "co-located" or "co-location" includes electric generation, storage, renewables, and associated facilities on a customer's site as well as any location where the connection to the electrical utility enables resilient power supply to support the development of power supply to meet the customer's needs. An agreement regarding co-location may also include potential co-ownership of the electric generation and associate facilities by the electrical utility and the customer. A customer participating in a co-location or co-ownership agreement shall not be considered an electrical utility.
(E) Notwithstanding opportunities for co-located resources, the General Assembly also encourages electrical utilities to continue to facilitate service to new electric loads in excess of 50 megawatts and to require operational and financial performance requirements for such customers to receive service pursuant to tariffed electrical utility rates or contracts approved by the commission, and to ensure appropriate protections and risk mitigation for the protection of the electrical utility's existing customers. The electrical utility may meet these objectives by: (1) filing form contracts with the commission; (2) tariff offerings or services regulations filed with the commission; or (3) performance and credit policies reviewed by the Office of Regulatory Staff.
HISTORY: 2025 Act No. 41 (H.3309), SECTION 32, eff May 12, 2025.
Editor's Note
2025 Act No. 41, SECTION 1, provides as follows:
"SECTION 1. This act may be cited as the 'South Carolina Energy Security Act.' "
2025 Act No. 41, SECTION 33, provides as follows:
"SECTION 33. (A) To foster economic development and future jobs in this State resulting from the supply chains associated with the same while supporting the significant and growing energy and capacity needs of the State, enhance grid resiliency, and maintain reliability, the General Assembly finds that the State of South Carolina should take steps necessary to encourage the development of a diverse mix of long-lead, clean generation resources that may include nuclear and advanced nuclear, biomass as defined in Section 12-63-20(B)(2) of the S.C. Code, hydrogen-capable resources, fusion energy, and other technologies, and should preserve the option of efficiency development of such long-lead resources with timely actions to establish or maintain eligibility for or capture available tax or other financial incentives or address operational needs.
"(B) For an electrical utility to capture available tax or other financial or operational incentives for South Carolina ratepayers in a timely manner, the commission may find that actions by an electrical utility in pursuit of the directives in Section 58-37-35(A) are in the public interest, provided that the commission determines that such proposed actions are in the public interest and reasonably balance economic development and industry retention benefits, capacity expansion benefits, resource adequacy and diversification and potential risks, costs, and benefits to ratepayers and otherwise comply with all other legal requirements applicable to the electrical utility's proposed action. For the South Carolina Public Service Authority, the Office of Regulatory Staff and the Public Service Authority's board of directors shall apply the same principles described in this subsection in evaluating and approving actions proposed by the management of the Public Service Authority to achieve the objectives of this section."
2025 Act No. 41, SECTION 41, provides as follows:
"SECTION 41. (A) Five years after the effective date of this act, the Office of the Regulatory Staff shall prepare a report, to be filed with the Public Utilities Review Committee and the General Assembly, to address the implementation of Article 24, Chapter 27, Title 58 as it relates to the following areas:
"(1) assessing the functioning of the procedures established by section with recommendation for any changes required to ensure their efficient functioning, to promote regulatory efficiency, and to make further the establishment of just, reasonable, and fair rates;
"(2) assessing the effect of rates on ratepayers of all classes;
"(3) assessing the reliability of the electric system and whether investments made by electric utilities increased reliability compared to any change in electric utility rates experienced by ratepayers within the same timeframe; and
"(4) any other information requested by the General Assembly to be included within the report.
"(B) The Office of Regulatory Staff may engage a qualified, independent third party to assist in preparation of the report.
"(C) All expenses and charges incurred by the Office of Regulatory Staff in the performance of its duties within this section may be defrayed by assessments made by the Comptroller General against the regulated electrical utilities regulated and based upon twenty-five percent of the gross revenues collected by such electrical utilities from their business done wholly within this State in the manner set out in Section 58-4-60 for other corporations."
2025 Act No. 41, SECTION 42, provides as follows:
"SECTION 42. Upon passage of this act, Dominion Energy shall evaluate the process for converting the Wateree Generating Station from coal-fired generation to biomass-fired generation. Biomass-fired generation includes, but is not limited to, generation from the firing of wood pellets and wood chips. Dominion Energy must make a report concerning the conversion process to the Public Service Commission and General Assembly by no later than January 13, 2026."