CHAPTER 103.

Public Service Commission

SECTION 340.

Adjustment of Bills.

103-340. Adjustment of Bills.

If it is found that an electrical utility has directly or indirectly, by any device whatsoever, demanded, charged, collected or received from any customer a greater or lesser compensation for any service rendered or to be rendered by such electrical utility than that prescribed in the schedules of such electrical utility applicable thereto, then filed in the manner provided in Chapter 27 of Title 58 of the South Carolina Code of Laws; or if it is found that any customer has received or accepted any service from an electrical utility for a compensation greater or lesser than that prescribed in such schedules; or if, for any reason, billing error has resulted in a greater or lesser charge than that incurred by the customer for the actual service rendered, then the method of adjustment for such overcharge or undercharge shall be as provided by the following:

1. Fast or Slow Meters. If the overcharge or undercharge is the result of a fast or slow meter, then the method of compensation shall be as follows:

a. In case of a disputed account, involving the accuracy of a meter, such meter shall be tested upon request of the customer, as specified in 103-370(2).

b. In the event that the meter so tested is found to have an error in registration of more than two (2) per cent, the bills will be increased or decreased accordingly, but in no case shall such a correction be made for more than sixty days.

2. Customer Willfully Overcharged. If the electrical utility has willfully overcharged any customer, except as provided for in 1 of this rule then the method of adjustment shall be as provided in the S. C. Code Ann. Section 58-27-960, and Section 58-27-2410 et seq. (1976).

3. Customer Inadvertently Overcharged. If the electrical utility has inadvertently overcharged a customer as a result of a misapplied schedule, an error in reading the meter, a skipped meter reading, or any other human or machine error, except as provided in 1 of this rule, the electrical utility shall, at the customer's option, credit or refund the excess amount paid by that customer or credit the amount billed as provided by the following:

a. If the interval during which the customer was overcharged can be determined, then the electrical utility shall credit or refund the excess amount charged during that entire interval provided that the applicable statute of limitations shall not be exceeded.

b. If the interval during which the customer was overcharged cannot be determined then the electrical utility shall credit or refund the excess amount charged during the twelve-month period preceding the date when the billing error was discovered.

c. If the exact usage and/or demand incurred by the customer during the billing periods subject to adjustment cannot be determined, then the refund shall be based on an appropriate estimated usage and/or demand.

4. Customer Undercharged Due to Willfully Misleading Company. If the electrical utility has undercharged any customer as a result of a fraudulent or willfully misleading action of that customer, or any such action by any person (other than the employees or agents of the electrical utility), such as tampering with, or bypassing the meter when it is evident that such tampering or bypassing occurred during the residency of that customer, or if it is evident that a customer has knowledge of being undercharged without notifying the electrical utility as such, then notwithstanding 1 of this rule, the electrical utility shall recover the deficient amount provided as follows:

a. If the interval during which the customer was undercharged can be determined, then the electrical utility shall collect the deficient amount incurred during that entire interval, provided that the applicable statute of limitations is not exceeded.

b. If the interval during which the customer was undercharged cannot be determined, then the electrical utility shall collect the deficient amount incurred during the twelve-month period preceding the date when the billing error was discovered by the electrical utility.

c. If the usage and/or demand incurred by that customer during the billing periods subject to adjustment cannot be determined, then the adjustment shall be based on an appropriate estimated usage and/or demand.

d. If the metering equipment has been removed or damaged, then the electrical utility shall collect the estimated cost of repairing and/or replacing such equipment.

5. Equal Payment Plans. An electrical utility may provide payment plans wherein the charge for each billing period is the estimated total annual bill divided by the number of billing periods prescribed by the plan. The difference between the actual and estimated annual bill is to be resolved by one payment at the end of the equal payment plan year, unless otherwise approved by the commission. However, any incorrect billing under equal payment plans shall be subject to this rule.

6. Customer Undercharged Due to Human or Machine Error. If the electrical utility has undercharged any customer as a result of a misapplied schedule, an error in reading the meter, a skipped meter reading, or any human or machine error, except as provided in 1, 2 and 4 of this rule then the electrical utility may recover the deficient amount as provided as follows:

a. If the interval during which a consumer having a demand of less than 50 KW was undercharged can be determined, then the electrical utility may collect the deficient amount incurred during that entire interval up to a maximum period of six months. For a consumer having a demand of 50 KW or greater, the maximum period shall be twelve months.

b. If the interval during which a consumer was undercharged cannot be determined, then the electrical utility may collect the deficient amount incurred during the six-month period preceding the date when the billing error was discovered by the electrical utility. For a consumer having a demand of 50 KW or greater, the maximum period shall be twelve months.

c. The customer shall be allowed to pay the deficient amount, in equal installments added to the regular monthly bills, over the same number of billing periods which occurred during the interval the customer was subject to pay the deficient amount.

d. If the usage and/or demand incurred by that person during the billing periods subject to adjustment cannot be determined, then the adjustment shall be based on an appropriate estimated usage and/or demand.

HISTORY: Amended by State Register Volume 32, Issue No. 5, eff May 23, 2008.